STEM Labs/Maker Spaces

Updated June 11, 2020

STEM Labs/Maker Spaces
Program/Design  November 2017 - May 2018
Construction Doc  June 2018 - February 2019
Bidding  March 2019 - April 2019
Construction  June 2019 - September 2021


Progress
September 1, 2020 - STEM Building Completed. Building hosting Rocketry, CTE, Computer and Fashion Design courses.   
     AHHS STEM Common Area    AHHS STEM Classroom

     AHHS STEM Common Area 2    AHHS STEM Classroom 2

AHHS STEM Rocketry Shop
June 11, 2020 - Interior finishes and metal casework are being installed.  Glass sectional door has been installed.  Ceiling grid and light fixtures are in place.
Construction of Rocketry  Construction of Rocketry
Construction of Rocketry  Exterior of STEM Building
Exterior of STEM Building  Construction of STEM Building
Interior of STEM Building  Interior of STEM Building
Interior of STEM Building  Interior of STEM Classroom
Interior of STEM Building  Interior of STEM Building

May 20, 2020 - Brick work is complete.  Roof work is ongoing.  Interior finishes such as plywood wall panels, polished concrete and metal casework are being installed.  Glass sectional door has been installed.  Ceiling grid and light fixtures are in place.  Earthwork continues in the courtyard area.
 AHHS STEM Birdseye View  AHHS STEM Classroom Space
AHHS STEM Maker Space  AHHS STEM Metal Casework
AHHS STEM Rocketry Shop
March 31, 2020 - Brick and prep work for interior finish are ongoing.  Exterior glazing has been installed.  Metal ceilings are being installed in the Maker Spaces. 
 AHHS STEM Exterior  AHHS STEM Exterior
AHHS STEM Maker Space AHHS STEM Maker Space
AHHS STEM Metal Ceiling
AHHS STEM Rocketry Classroom  AHHS STEM Rocketry Shop

February 18, 2020 - Exterior waterproofing is in place.   Gyp Board is in place and walls are being taped and floated.  Ductwork, plumbing, and electrical work continues.
 AHHS STEM  AHHS STEM Exterior
AHHS STEM Open Classroom
January 7, 2020 - Concrete floors have been polished.  Exterior sheathing is in place.  Concrete walks and steps have been poured.  Interior framing is in place. Ductwork, plumbing and electrical is underway.  Wood blocking is being placed for future finishes and equipment.
 AHHS STEM East Facade  AHHS Stem Entry
AHHS STEM Framing  AHHS STEM West Facade
November 13, 2019 - Concrete slab is in place.  Building frame is going up.  Metal deck is being installed.
High School STEM
 
 
 

AHISD welcomes patrons comments on any of the facility drawings.

Please email Mike Hagar at [email protected]